Author Question: In case of task dependencies in a project, all tasks must begin and end at the same time. ... (Read 43 times)

Jipu 123

  • Hero Member
  • *****
  • Posts: 569
In case of task dependencies in a project, all tasks must begin and end at the same time.
 
  Indicate whether the statement is true or false

Question 2

The critical path determines the earliest date by considering the shortest path through the network of activities.
 
  Indicate whether the statement is true or false



zoeyesther

  • Sr. Member
  • ****
  • Posts: 315
Answer to Question 1

FALSE

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

One way to reduce acid reflux is to lose two or three pounds. Most people lose weight in the belly area first when they increase exercise, meaning that heartburn can be reduced quickly by this method.

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

Did you know?

IgA antibodies protect body surfaces exposed to outside foreign substances. IgG antibodies are found in all body fluids. IgM antibodies are the first type of antibody made in response to an infection. IgE antibody levels are often high in people with allergies. IgD antibodies are found in tissues lining the abdomen and chest.

Did you know?

Before a vaccine is licensed in the USA, the Food and Drug Administration (FDA) reviews it for safety and effectiveness. The CDC then reviews all studies again, as well as the American Academy of Pediatrics and the American Academy of Family Physicians. Every lot of vaccine is tested before administration to the public, and the FDA regularly inspects vaccine manufacturers' facilities.

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

For a complete list of videos, visit our video library