A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required to complete it.
 
  A) PERT chart
  B) DFD
  C) feasibility study
  D) Gantt chart
  E) ergonomic chart

Question 2

In which phase of the SDLC are the system requirements studied and structured?
 
  A) Implementation
  B) Analysis
  C) Design
  D) Planning


Kingjoffery

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Sildenafil (Viagra®) has two actions that may be of consequence in patients with heart disease. It can lower the blood pressure, and it can interact with nitrates. It should never be used in patients who are taking nitrates.

Did you know?

Stroke kills people from all ethnic backgrounds, but the people at highest risk for fatal strokes are: black men, black women, Asian men, white men, and white women.

Did you know?

One way to reduce acid reflux is to lose two or three pounds. Most people lose weight in the belly area first when they increase exercise, meaning that heartburn can be reduced quickly by this method.

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

Cutaneous mucormycosis is a rare fungal infection that has been fatal in at least 29% of cases, and in as many as 83% of cases, depending on the patient's health prior to infection. It has occurred often after natural disasters such as tornados, and early treatment is essential.

For a complete list of videos, visit our video library