Author Question: A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required ... (Read 121 times)

LCritchfi

  • Hero Member
  • *****
  • Posts: 519
A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required to complete it.
 
  A) PERT chart
  B) DFD
  C) feasibility study
  D) Gantt chart
  E) ergonomic chart

Question 2

In which phase of the SDLC are the system requirements studied and structured?
 
  A) Implementation
  B) Analysis
  C) Design
  D) Planning


Kingjoffery

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Carbamazepine can interfere with the results of home pregnancy tests. If you are taking carbamazepine, do not try to test for pregnancy at home.

Did you know?

Most childhood vaccines are 90–99% effective in preventing disease. Side effects are rarely serious.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

Did you know?

In Eastern Europe and Russia, interferon is administered intranasally in varied doses for the common cold and influenza. It is claimed that this treatment can lower the risk of infection by as much as 60–70%.

Did you know?

The immune system needs 9.5 hours of sleep in total darkness to recharge completely.

For a complete list of videos, visit our video library