Author Question: A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required ... (Read 139 times)

LCritchfi

  • Hero Member
  • *****
  • Posts: 519
A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required to complete it.
 
  A) PERT chart
  B) DFD
  C) feasibility study
  D) Gantt chart
  E) ergonomic chart

Question 2

In which phase of the SDLC are the system requirements studied and structured?
 
  A) Implementation
  B) Analysis
  C) Design
  D) Planning


Kingjoffery

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The Centers for Disease Control and Prevention has released reports detailing the deaths of infants (younger than 1 year of age) who died after being given cold and cough medications. This underscores the importance of educating parents that children younger than 2 years of age should never be given over-the-counter cold and cough medications without consulting their physicians.

Did you know?

There are actually 60 minerals, 16 vitamins, 12 essential amino acids, and three essential fatty acids that your body needs every day.

Did you know?

Egg cells are about the size of a grain of sand. They are formed inside of a female's ovaries before she is even born.

Did you know?

Recent studies have shown that the number of medication errors increases in relation to the number of orders that are verified per pharmacist, per work shift.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

For a complete list of videos, visit our video library