Author Question: A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required ... (Read 45 times)

LCritchfi

  • Hero Member
  • *****
  • Posts: 519
A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required to complete it.
 
  A) PERT chart
  B) DFD
  C) feasibility study
  D) Gantt chart
  E) ergonomic chart

Question 2

In which phase of the SDLC are the system requirements studied and structured?
 
  A) Implementation
  B) Analysis
  C) Design
  D) Planning


Kingjoffery

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The heart is located in the center of the chest, with part of it tipped slightly so that it taps against the left side of the chest.

Did you know?

The FDA recognizes 118 routes of administration.

Did you know?

Not getting enough sleep can greatly weaken the immune system. Lack of sleep makes you more likely to catch a cold, or more difficult to fight off an infection.

Did you know?

Less than one of every three adults with high LDL cholesterol has the condition under control. Only 48.1% with the condition are being treated for it.

Did you know?

Hyperthyroidism leads to an increased rate of metabolism and affects about 1% of women but only 0.1% of men. For most people, this increased metabolic rate causes the thyroid gland to become enlarged (known as a goiter).

For a complete list of videos, visit our video library