Author Question: Intangible metrics in the model for IT project justification include each of the following except ... (Read 26 times)

wenmo

  • Hero Member
  • *****
  • Posts: 540
Intangible metrics in the model for IT project justification include each of the following except
 
  A) lead-time.
  B) competitive advantage.
  C) services to society.
  D) growth enabler.

Question 2

An example of G2C is
 
  A) an employee at the Chamber of Commerce obtaining local demographic data from a U.S. Census site.
  B) a driver paying traffic tickets online.
  C) a road contractor using the Internet to submit a closed bid on a paving contract.
  D) a regional hospital conducting an online reverse auction for cleaning supplies.



mk6555

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

An identified risk factor for osteoporosis is the intake of excessive amounts of vitamin A. Dietary intake of approximately double the recommended daily amount of vitamin A, by women, has been shown to reduce bone mineral density and increase the chances for hip fractures compared with women who consumed the recommended daily amount (or less) of vitamin A.

Did you know?

Children of people with alcoholism are more inclined to drink alcohol or use hard drugs. In fact, they are 400 times more likely to use hard drugs than those who do not have a family history of alcohol addiction.

Did you know?

Blood is approximately twice as thick as water because of the cells and other components found in it.

Did you know?

Fungal nail infections account for up to 30% of all skin infections. They affect 5% of the general population—mostly people over the age of 70.

Did you know?

Throughout history, plants containing cardiac steroids have been used as heart drugs and as poisons (e.g., in arrows used in combat), emetics, and diuretics.

For a complete list of videos, visit our video library