Author Question: Intangible metrics in the model for IT project justification include each of the following except ... (Read 65 times)

wenmo

  • Hero Member
  • *****
  • Posts: 540
Intangible metrics in the model for IT project justification include each of the following except
 
  A) lead-time.
  B) competitive advantage.
  C) services to society.
  D) growth enabler.

Question 2

An example of G2C is
 
  A) an employee at the Chamber of Commerce obtaining local demographic data from a U.S. Census site.
  B) a driver paying traffic tickets online.
  C) a road contractor using the Internet to submit a closed bid on a paving contract.
  D) a regional hospital conducting an online reverse auction for cleaning supplies.



mk6555

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Malaria mortality rates are falling. Increased malaria prevention and control measures have greatly improved these rates. Since 2000, malaria mortality rates have fallen globally by 60% among all age groups, and by 65% among children under age 5.

Did you know?

Sperm cells are so tiny that 400 to 500 million (400,000,000–500,000,000) of them fit onto 1 tsp.

Did you know?

Although not all of the following muscle groups are commonly used, intramuscular injections may be given into the abdominals, biceps, calves, deltoids, gluteals, laterals, pectorals, quadriceps, trapezoids, and triceps.

Did you know?

Only 12 hours after an egg cell is fertilized by a sperm cell, the egg cell starts to divide. As it continues to divide, it moves along the fallopian tube toward the uterus at about 1 inch per day.

Did you know?

According to the CDC, approximately 31.7% of the U.S. population has high low-density lipoprotein (LDL) or "bad cholesterol" levels.

For a complete list of videos, visit our video library