Author Question: Intangible metrics in the model for IT project justification include each of the following except ... (Read 25 times)

wenmo

  • Hero Member
  • *****
  • Posts: 540
Intangible metrics in the model for IT project justification include each of the following except
 
  A) lead-time.
  B) competitive advantage.
  C) services to society.
  D) growth enabler.

Question 2

An example of G2C is
 
  A) an employee at the Chamber of Commerce obtaining local demographic data from a U.S. Census site.
  B) a driver paying traffic tickets online.
  C) a road contractor using the Internet to submit a closed bid on a paving contract.
  D) a regional hospital conducting an online reverse auction for cleaning supplies.



mk6555

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Drying your hands with a paper towel will reduce the bacterial count on your hands by 45–60%.

Did you know?

Alcohol acts as a diuretic. Eight ounces of water is needed to metabolize just 1 ounce of alcohol.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

Did you know?

Adults are resistant to the bacterium that causes Botulism. These bacteria thrive in honey – therefore, honey should never be given to infants since their immune systems are not yet resistant.

Did you know?

Nearly all drugs pass into human breast milk. How often a drug is taken influences the amount of drug that will pass into the milk. Medications taken 30 to 60 minutes before breastfeeding are likely to be at peak blood levels when the baby is nursing.

For a complete list of videos, visit our video library