Which of the following is NOT an estimate of time for tasks in a PERT chart?
 
  A) Optimistic
  B) Pessimistic
  C) Realistic
  D) Probabilistic

Question 2

Which of the following is NOT important for a checklist for an emergency care plan?
 
  A) Program staff can have time off after traumatic incidents
  B) Standing orders are available for common emergencies
  C) The care plan is updated regularly
  D) High-risk participants are known to program staff



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

frejo

  • Sr. Member
  • ****
  • Posts: 349
Answer to Question 1

C

Answer to Question 2

A




scienceeasy

  • Member
  • Posts: 565
Reply 2 on: Jul 12, 2018
Wow, this really help


bdobbins

  • Member
  • Posts: 326
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

The ratio of hydrogen atoms to oxygen in water (H2O) is 2:1.

Did you know?

It is difficult to obtain enough calcium without consuming milk or other dairy foods.

Did you know?

Warfarin was developed as a consequence of the study of a strange bleeding disorder that suddenly occurred in cattle on the northern prairies of the United States in the early 1900s.

Did you know?

All adults should have their cholesterol levels checked once every 5 years. During 2009–2010, 69.4% of Americans age 20 and older reported having their cholesterol checked within the last five years.

For a complete list of videos, visit our video library