Author Question: To review a project's tasks and their interrelationships, you would use a A) PERT chart. B) ... (Read 60 times)

audragclark

  • Hero Member
  • *****
  • Posts: 579
To review a project's tasks and their interrelationships, you would use a
 
  A) PERT chart.
  B) Gantt chart.
  C) either A or B.
  D) neither A nor B.

Question 2

Digital subscriber lines
 
  A) operate over existing telephone lines to carry voice, data, and video.
  B) operate over coaxial cable lines to deliver Internet access.
  C) are very-high-speed data lines typically leased from long-distance telephone companies.
  D) have up to twenty-four 64-Kbps channels.
  E) are assigned to every computer on the Internet.



mochi09

  • Sr. Member
  • ****
  • Posts: 335
Answer to Question 1

A

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Medication errors are three times higher among children and infants than with adults.

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

After 5 years of being diagnosed with rheumatoid arthritis, one every three patients will no longer be able to work.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

For a complete list of videos, visit our video library