Author Question: The S-curve in the figure above is based on _____. a. schedule data during month one b. ... (Read 63 times)

javeds

  • Hero Member
  • *****
  • Posts: 570
/
  The S-curve in the figure above is based on _____.
 
  a. schedule data during month one
  b. project schedule and actual costs during construction
  c. project schedule and estimate before construction begins
  d. tracking the project at an average pace

Question 2

Two important purposes of cost control are _____.
 
  a. staying within budget and producing historical data
  b. pricing and estimating
  c. project initiation and controlling scope of work
  d. developing preliminary reports and field estimates



snackralk

  • Sr. Member
  • ****
  • Posts: 363
Answer to Question 1

c

Answer to Question 2

a



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Studies show that systolic blood pressure can be significantly lowered by taking statins. In fact, the higher the patient's baseline blood pressure, the greater the effect of statins on his or her blood pressure.

Did you know?

More than 4.4billion prescriptions were dispensed within the United States in 2016.

Did you know?

On average, someone in the United States has a stroke about every 40 seconds. This is about 795,000 people per year.

Did you know?

Carbamazepine can interfere with the results of home pregnancy tests. If you are taking carbamazepine, do not try to test for pregnancy at home.

Did you know?

The people with the highest levels of LDL are Mexican American males and non-Hispanic black females.

For a complete list of videos, visit our video library