This topic contains a solution. Click here to go to the answer

Author Question: Dimensions needed to calculate the volume of concrete needed for a job are found in the _____. a. ... (Read 133 times)

Engineer

  • Hero Member
  • *****
  • Posts: 527
Dimensions needed to calculate the volume of concrete needed for a job are found in the _____.
 
  a. building codes
  b. construction drawings
  c. materials lists
  d. job specifica

Question 2

An FHP belt that is coded 4L300 is _____ inches long.
 
  a. 20
  b. 30
  c. 200
  d. 300



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

TINA

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

b

Answer to Question 2

b




Engineer

  • Member
  • Posts: 527
Reply 2 on: Jul 24, 2018
Excellent


patma1981

  • Member
  • Posts: 292
Reply 3 on: Yesterday
Great answer, keep it coming :)

 

Did you know?

Essential fatty acids have been shown to be effective against ulcers, asthma, dental cavities, and skin disorders such as acne.

Did you know?

The Centers for Disease Control and Prevention has released reports detailing the deaths of infants (younger than 1 year of age) who died after being given cold and cough medications. This underscores the importance of educating parents that children younger than 2 years of age should never be given over-the-counter cold and cough medications without consulting their physicians.

Did you know?

The training of an anesthesiologist typically requires four years of college, 4 years of medical school, 1 year of internship, and 3 years of residency.

Did you know?

Human kidneys will clean about 1 million gallons of blood in an average lifetime.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

For a complete list of videos, visit our video library