This topic contains a solution. Click here to go to the answer

Author Question: Dimensions needed to calculate the volume of concrete needed for a job are found in the _____. a. ... (Read 84 times)

Engineer

  • Hero Member
  • *****
  • Posts: 527
Dimensions needed to calculate the volume of concrete needed for a job are found in the _____.
 
  a. building codes
  b. construction drawings
  c. materials lists
  d. job specifica

Question 2

An FHP belt that is coded 4L300 is _____ inches long.
 
  a. 20
  b. 30
  c. 200
  d. 300



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

TINA

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

b

Answer to Question 2

b




Engineer

  • Member
  • Posts: 527
Reply 2 on: Jul 24, 2018
Excellent


okolip

  • Member
  • Posts: 362
Reply 3 on: Yesterday
Thanks for the timely response, appreciate it

 

Did you know?

About 3% of all pregnant women will give birth to twins, which is an increase in rate of nearly 60% since the early 1980s.

Did you know?

Approximately 25% of all reported medication errors result from some kind of name confusion.

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Prostaglandins were first isolated from human semen in Sweden in the 1930s. They were so named because the researcher thought that they came from the prostate gland. In fact, prostaglandins exist and are synthesized in almost every cell of the body.

Did you know?

Pubic lice (crabs) are usually spread through sexual contact. You cannot catch them by using a public toilet.

For a complete list of videos, visit our video library