This topic contains a solution. Click here to go to the answer

Author Question: Dimensions needed to calculate the volume of concrete needed for a job are found in the _____. a. ... (Read 117 times)

Engineer

  • Hero Member
  • *****
  • Posts: 527
Dimensions needed to calculate the volume of concrete needed for a job are found in the _____.
 
  a. building codes
  b. construction drawings
  c. materials lists
  d. job specifica

Question 2

An FHP belt that is coded 4L300 is _____ inches long.
 
  a. 20
  b. 30
  c. 200
  d. 300



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

TINA

  • Sr. Member
  • ****
  • Posts: 336
Answer to Question 1

b

Answer to Question 2

b




Engineer

  • Member
  • Posts: 527
Reply 2 on: Jul 24, 2018
Great answer, keep it coming :)


isabelt_18

  • Member
  • Posts: 342
Reply 3 on: Yesterday
Gracias!

 

Did you know?

Vital signs (blood pressure, temperature, pulse rate, respiration rate) should be taken before any drug administration. Patients should be informed not to use tobacco or caffeine at least 30 minutes before their appointment.

Did you know?

Green tea is able to stop the scent of garlic or onion from causing bad breath.

Did you know?

Intradermal injections are somewhat difficult to correctly administer because the skin layers are so thin that it is easy to accidentally punch through to the deeper subcutaneous layer.

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

Did you know?

The National Institutes of Health have supported research into acupuncture. This has shown that acupuncture significantly reduced pain associated with osteoarthritis of the knee, when used as a complement to conventional therapies.

For a complete list of videos, visit our video library