Author Question: Establishing cost control is part of the _____ phase. A) bidding B) pre-construction C) ... (Read 99 times)

Anajune7

  • Hero Member
  • *****
  • Posts: 574
Establishing cost control is part of the _____ phase.
 
  A) bidding
  B) pre-construction
  C) construction
  D) closeout

Question 2

Which delivery system involves the owner, architect/engineer, and general contractor?
 
  A) The traditional contract delivery system
  B) The design-build system
  C) The construction management system (CM)
  D) The engineering-procurement-construction (E-P-C) system



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

harveenkau8139

  • Sr. Member
  • ****
  • Posts: 304
Answer to Question 1

Answer: B

Answer to Question 2

Answer: A





 

Did you know?

Asthma cases in Americans are about 75% higher today than they were in 1980.

Did you know?

In women, pharmacodynamic differences include increased sensitivity to (and increased effectiveness of) beta-blockers, opioids, selective serotonin reuptake inhibitors, and typical antipsychotics.

Did you know?

Multiple experimental evidences have confirmed that at the molecular level, cancer is caused by lesions in cellular DNA.

Did you know?

Glaucoma is a leading cause of blindness. As of yet, there is no cure. Everyone is at risk, and there may be no warning signs. It is six to eight times more common in African Americans than in whites. The best and most effective way to detect glaucoma is to receive a dilated eye examination.

Did you know?

Thyroid conditions may make getting pregnant impossible.

For a complete list of videos, visit our video library