Establishing cost control is part of the _____ phase.
 
  A) bidding
  B) pre-construction
  C) construction
  D) closeout

Question 2

Which delivery system involves the owner, architect/engineer, and general contractor?
 
  A) The traditional contract delivery system
  B) The design-build system
  C) The construction management system (CM)
  D) The engineering-procurement-construction (E-P-C) system



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

harveenkau8139

  • Sr. Member
  • ****
  • Posts: 304
Answer to Question 1

Answer: B

Answer to Question 2

Answer: A





 

Did you know?

Drying your hands with a paper towel will reduce the bacterial count on your hands by 45–60%.

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

Did you know?

The U.S. Pharmacopeia Medication Errors Reporting Program states that approximately 50% of all medication errors involve insulin.

Did you know?

The average older adult in the United States takes five prescription drugs per day. Half of these drugs contain a sedative. Alcohol should therefore be avoided by most senior citizens because of the dangerous interactions between alcohol and sedatives.

Did you know?

Medication errors are three times higher among children and infants than with adults.

For a complete list of videos, visit our video library