This topic contains a solution. Click here to go to the answer

Author Question: Actual measurements for construction are taken from the _____. a. primary control points b. ... (Read 110 times)

appyboo

  • Hero Member
  • *****
  • Posts: 527
Actual measurements for construction are taken from the _____.
 
  a. primary control points
  b. secondary control points
  c. subsidiary control points
  d. working control points

Question 2

The location and levelness of concrete forms are established by using _____.
 
  a. azimuth stakes
  b. control centers
  c. elevation posts
  d. control points



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

d

Answer to Question 2

d




ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334

 

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

Did you know?

A good example of polar molecules can be understood when trying to make a cake. If water and oil are required, they will not mix together. If you put them into a measuring cup, the oil will rise to the top while the water remains on the bottom.

Did you know?

Pope Sylvester II tried to introduce Arabic numbers into Europe between the years 999 and 1003, but their use did not catch on for a few more centuries, and Roman numerals continued to be the primary number system.

Did you know?

Illicit drug use costs the United States approximately $181 billion every year.

Did you know?

Drug-induced pharmacodynamic effects manifested in older adults include drug-induced renal toxicity, which can be a major factor when these adults are experiencing other kidney problems.

For a complete list of videos, visit our video library