This topic contains a solution. Click here to go to the answer

Author Question: Actual measurements for construction are taken from the _____. a. primary control points b. ... (Read 86 times)

appyboo

  • Hero Member
  • *****
  • Posts: 527
Actual measurements for construction are taken from the _____.
 
  a. primary control points
  b. secondary control points
  c. subsidiary control points
  d. working control points

Question 2

The location and levelness of concrete forms are established by using _____.
 
  a. azimuth stakes
  b. control centers
  c. elevation posts
  d. control points



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

d

Answer to Question 2

d




ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334

 

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

Alcohol acts as a diuretic. Eight ounces of water is needed to metabolize just 1 ounce of alcohol.

Did you know?

Hypertension is a silent killer because it is deadly and has no significant early symptoms. The danger from hypertension is the extra load on the heart, which can lead to hypertensive heart disease and kidney damage. This occurs without any major symptoms until the high blood pressure becomes extreme. Regular blood pressure checks are an important method of catching hypertension before it can kill you.

Did you know?

More than 30% of American adults, and about 12% of children utilize health care approaches that were developed outside of conventional medicine.

Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

For a complete list of videos, visit our video library