This topic contains a solution. Click here to go to the answer

Author Question: Secondary control points are usually established on the job site by _____. a. utility crews b. ... (Read 81 times)

lak

  • Hero Member
  • *****
  • Posts: 546
Secondary control points are usually established on the job site by _____.
 
  a. utility crews
  b. grading contractors
  c. carpenters
  d. inspectors

Question 2

Once building lines are established on the batter boards, each string is held in alignment by using a _____.
 
  a. nail
  b. clamp
  c. saw kerf
  d. staple



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

fffftttt

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

c

Answer to Question 2

c





 

Did you know?

A good example of polar molecules can be understood when trying to make a cake. If water and oil are required, they will not mix together. If you put them into a measuring cup, the oil will rise to the top while the water remains on the bottom.

Did you know?

After 5 years of being diagnosed with rheumatoid arthritis, one every three patients will no longer be able to work.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

A strange skin disease referred to as Morgellons has occurred in the southern United States and in California. Symptoms include slowly healing sores, joint pain, persistent fatigue, and a sensation of things crawling through the skin. Another symptom is strange-looking, threadlike extrusions coming out of the skin.

Did you know?

After a vasectomy, it takes about 12 ejaculations to clear out sperm that were already beyond the blocked area.

For a complete list of videos, visit our video library