Actual measurements for construction are taken from the _____.
 
  a. primary control points
  b. secondary control points
  c. subsidiary control points
  d. working control points

Question 2

The location and levelness of concrete forms are established by using _____.
 
  a. azimuth stakes
  b. control centers
  c. elevation posts
  d. control points



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

d

Answer to Question 2

d




ryrychapman11

  • Sr. Member
  • ****
  • Posts: 334

 

Did you know?

Signs of depression include feeling sad most of the time for 2 weeks or longer; loss of interest in things normally enjoyed; lack of energy; sleep and appetite disturbances; weight changes; feelings of hopelessness, helplessness, or worthlessness; an inability to make decisions; and thoughts of death and suicide.

Did you know?

Walt Disney helped combat malaria by making an animated film in 1943 called The Winged Scourge. This short film starred the seven dwarfs and taught children that mosquitos transmit malaria, which is a very bad disease. It advocated the killing of mosquitos to stop the disease.

Did you know?

Blood is approximately twice as thick as water because of the cells and other components found in it.

Did you know?

After 5 years of being diagnosed with rheumatoid arthritis, one every three patients will no longer be able to work.

Did you know?

Adults are resistant to the bacterium that causes Botulism. These bacteria thrive in honey – therefore, honey should never be given to infants since their immune systems are not yet resistant.

For a complete list of videos, visit our video library