Author Question: Material Requirements Planning (MRP) operates on a component product level which is the level ... (Read 48 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above

Question 2

In two-way ANOVA, there are ___________________ _ factors, each of which operates on ___________________ _ or more levels.
 Fill in the blank(s) with correct word



irishcancer18

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

two; two
2, 2



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Recent studies have shown that the number of medication errors increases in relation to the number of orders that are verified per pharmacist, per work shift.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

The first war in which wide-scale use of anesthetics occurred was the Civil War, and 80% of all wounds were in the extremities.

Did you know?

You should not take more than 1,000 mg of vitamin E per day. Doses above this amount increase the risk of bleeding problems that can lead to a stroke.

For a complete list of videos, visit our video library