Author Question: Material Requirements Planning (MRP) operates on a component product level which is the level ... (Read 84 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above

Question 2

In two-way ANOVA, there are ___________________ _ factors, each of which operates on ___________________ _ or more levels.
 Fill in the blank(s) with correct word



irishcancer18

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

two; two
2, 2



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Fewer than 10% of babies are born on their exact due dates, 50% are born within 1 week of the due date, and 90% are born within 2 weeks of the date.

Did you know?

In Eastern Europe and Russia, interferon is administered intranasally in varied doses for the common cold and influenza. It is claimed that this treatment can lower the risk of infection by as much as 60–70%.

Did you know?

Essential fatty acids have been shown to be effective against ulcers, asthma, dental cavities, and skin disorders such as acne.

Did you know?

There used to be a metric calendar, as well as metric clocks. The metric calendar, or "French Republican Calendar" divided the year into 12 months, but each month was divided into three 10-day weeks. Each day had 10 decimal hours. Each hour had 100 decimal minutes. Due to lack of popularity, the metric clocks and calendars were ended in 1795, three years after they had been first marketed.

Did you know?

Illicit drug use costs the United States approximately $181 billion every year.

For a complete list of videos, visit our video library