Author Question: Material Requirements Planning (MRP) operates on a component product level which is the level ... (Read 78 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above

Question 2

In two-way ANOVA, there are ___________________ _ factors, each of which operates on ___________________ _ or more levels.
 Fill in the blank(s) with correct word



irishcancer18

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

two; two
2, 2



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Methicillin-resistant Staphylococcus aureus or MRSA was discovered in 1961 in the United Kingdom. It if often referred to as a superbug. MRSA infections cause more deaths in the United States every year than AIDS.

Methicilli ...
Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

More than 20 million Americans cite use of marijuana within the past 30 days, according to the National Survey on Drug Use and Health (NSDUH). More than 8 million admit to using it almost every day.

Did you know?

Amphetamine poisoning can cause intravascular coagulation, circulatory collapse, rhabdomyolysis, ischemic colitis, acute psychosis, hyperthermia, respiratory distress syndrome, and pericarditis.

Did you know?

Drug-induced pharmacodynamic effects manifested in older adults include drug-induced renal toxicity, which can be a major factor when these adults are experiencing other kidney problems.

For a complete list of videos, visit our video library