Author Question: Resource requirements planning (RRP) a. is a long-run, macro-level planning tool. b. checks the ... (Read 44 times)

HudsonKB16

  • Hero Member
  • *****
  • Posts: 535
Resource requirements planning (RRP)
 a. is a long-run, macro-level planning tool.
  b. checks the feasibility of the master production schedule.
  c. checks the feasibility of the materials requirement plan.
  d. is a long-range materials plan that translates annual business plans.

Question 2

Which of the following is NOT one of the biggest B2C catalogers?
 a. Sears
  b. JCPenney
  c. Williams-Sonoma
  d. The Limited



soda0602

  • Sr. Member
  • ****
  • Posts: 313
Answer to Question 1

a

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Only 12 hours after an egg cell is fertilized by a sperm cell, the egg cell starts to divide. As it continues to divide, it moves along the fallopian tube toward the uterus at about 1 inch per day.

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

In the United States, an estimated 50 million unnecessary antibiotics are prescribed for viral respiratory infections.

Did you know?

The oldest recorded age was 122. Madame Jeanne Calment was born in France in 1875 and died in 1997. She was a vegetarian and loved olive oil, port wine, and chocolate.

Did you know?

Calcitonin is a naturally occurring hormone. In women who are at least 5 years beyond menopause, it slows bone loss and increases spinal bone density.

For a complete list of videos, visit our video library