Author Question: Activities with zero slack a. can be delayed. b. must be completed first. c. lie on a critical ... (Read 70 times)

ETearle

  • Hero Member
  • *****
  • Posts: 580
Activities with zero slack
 a. can be delayed.
  b. must be completed first.
  c. lie on a critical path.
  d. have no predecessors.

Question 2

A measure of the strength of the relationship between two variables is the _____.
 a. confidence interval estimate
  b. slope b1 of the estimated regression line
  c. standard error of the estimate
  d. correlation coefficient



chreslie

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

C

Answer to Question 2

d



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Asthma is the most common chronic childhood disease in the world. Most children who develop asthma have symptoms before they are 5 years old.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

Persons who overdose with cardiac glycosides have a better chance of overall survival if they can survive the first 24 hours after the overdose.

For a complete list of videos, visit our video library