Author Question: Referring to the SPC chart signals that a process is out of control, what type of problem does each ... (Read 81 times)

Beheh

  • Hero Member
  • *****
  • Posts: 520
Referring to the SPC chart signals that a process is out of control, what type of problem does each signal indicate? List the signals.
 
  What will be an ideal response?

Question 2

Which of the following is true about forecast bias?
 
  A) It is the mean absolute deviation.
  B) It is equal to the square root of the MSE.
  C) When it is negative it means that the forecasts tended to be high.
  D) When it is positive it means that the forecasts tended to be high.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

SeanoH09

  • Sr. Member
  • ****
  • Posts: 323
Answer to Question 1

The signals that something has changed are:
1. one or more points outside the control limits
2. nine or more points in a row above or below the center line
3. six or more points moving in the same direction (up or down)
4. 14 points in a row, alternating up and down.

The first signal means that something has caused the process to produce a higher (or lower) measure than would be normally expected. This could be a problem with variability or a jump one way or the other in the process center. Only one such point above or below the control limits is needed to reach the conclusion that a special cause situation exists.

The second signal implies that the process center is drifting up or down. For example, this type of situation could occur in a process that is sensitive to temperature. If for some reason temperature gradually is increasing, the output measure will gradually change with the temperature change.

The third signal indicates that the process average has shifted (higher or lower) due to some special circumstance. For instance, a control setting may have been changed causing the output measures to increase or decrease consistently.

The fourth signal indicates something is causing the process to change between measurements.

Answer to Question 2

C




Beheh

  • Member
  • Posts: 520
Reply 2 on: Jun 24, 2018
Gracias!


emsimon14

  • Member
  • Posts: 344
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

Lower drug doses for elderly patients should be used first, with titrations of the dose as tolerated to prevent unwanted drug-related pharmacodynamic effects.

Did you know?

Automated pill dispensing systems have alarms to alert patients when the correct dosing time has arrived. Most systems work with many varieties of medications, so patients who are taking a variety of drugs can still be in control of their dose regimen.

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

In 1835 it was discovered that a disease of silkworms known as muscardine could be transferred from one silkworm to another, and was caused by a fungus.

Did you know?

About 60% of newborn infants in the United States are jaundiced; that is, they look yellow. Kernicterus is a form of brain damage caused by excessive jaundice. When babies begin to be affected by excessive jaundice and begin to have brain damage, they become excessively lethargic.

For a complete list of videos, visit our video library