Author Question: If a defined project is determined to be feasible in the systems development life cycle (SDLC), the ... (Read 75 times)

Collmarie

  • Hero Member
  • *****
  • Posts: 569
If a defined project is determined to be feasible in the systems development life cycle (SDLC), the next step is to ________.
 
  A) create and test components
  B) form the project team
  C) maintain the system
  D) assess process results

Question 2

Entities are like __________; they are persons, places, or things.
 
  Fill in the blanks with correct word



vickyvicksss

  • Sr. Member
  • ****
  • Posts: 351
Answer to Question 1

B

Answer to Question 2

nouns



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

The liver is the only organ that has the ability to regenerate itself after certain types of damage. As much as 25% of the liver can be removed, and it will still regenerate back to its original shape and size. However, the liver cannot regenerate after severe damage caused by alcohol.

Did you know?

The shortest mature adult human of whom there is independent evidence was Gul Mohammed in India. In 1990, he was measured in New Delhi and stood 22.5 inches tall.

Did you know?

Though methadone is often used to treat dependency on other opioids, the drug itself can be abused. Crushing or snorting methadone can achieve the opiate "rush" desired by addicts. Improper use such as these can lead to a dangerous dependency on methadone. This drug now accounts for nearly one-third of opioid-related deaths.

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

For a complete list of videos, visit our video library