Author Question: A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required ... (Read 55 times)

LCritchfi

  • Hero Member
  • *****
  • Posts: 519
A(n) ________ shows each task as a horizontal bar whose length is proportional to the time required to complete it.
 
  A) PERT chart
  B) DFD
  C) feasibility study
  D) Gantt chart
  E) ergonomic chart

Question 2

In which phase of the SDLC are the system requirements studied and structured?
 
  A) Implementation
  B) Analysis
  C) Design
  D) Planning


Kingjoffery

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

Did you know?

All patients with hyperparathyroidism will develop osteoporosis. The parathyroid glands maintain blood calcium within the normal range. All patients with this disease will continue to lose calcium from their bones every day, and there is no way to prevent the development of osteoporosis as a result.

Did you know?

When intravenous medications are involved in adverse drug events, their harmful effects may occur more rapidly, and be more severe than errors with oral medications. This is due to the direct administration into the bloodstream.

Did you know?

Essential fatty acids have been shown to be effective against ulcers, asthma, dental cavities, and skin disorders such as acne.

Did you know?

Illicit drug use costs the United States approximately $181 billion every year.

For a complete list of videos, visit our video library