This topic contains a solution. Click here to go to the answer

Author Question: Flat-slab formwork is more costly to build because of the _____. a. need for special shoring b. ... (Read 81 times)

tth

  • Hero Member
  • *****
  • Posts: 579
Flat-slab formwork is more costly to build because of the _____.
 
  a. need for special shoring
  b. amount of material required
  c. complex reinforcement that must be built
  d. drop panels required at each column

Question 2

When using weave beads in flat open-root V-groove welds, use a _____.
 
  a. 10- to 15-degree drag angle
  b. 15- to 20-degree drag angle
  c. 10- to 15-degree push angle
  d. 35- to 40-degree push angle



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

atrochim

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

d

Answer to Question 2

a




tth

  • Member
  • Posts: 579
Reply 2 on: Jul 24, 2018
Wow, this really help


atrochim

  • Member
  • Posts: 331
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

A seasonal flu vaccine is the best way to reduce the chances you will get seasonal influenza and spread it to others.

Did you know?

Astigmatism is the most common vision problem. It may accompany nearsightedness or farsightedness. It is usually caused by an irregularly shaped cornea, but sometimes it is the result of an irregularly shaped lens. Either type can be corrected by eyeglasses, contact lenses, or refractive surgery.

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

Did you know?

In most cases, kidneys can recover from almost complete loss of function, such as in acute kidney (renal) failure.

Did you know?

Only 12 hours after an egg cell is fertilized by a sperm cell, the egg cell starts to divide. As it continues to divide, it moves along the fallopian tube toward the uterus at about 1 inch per day.

For a complete list of videos, visit our video library