This topic contains a solution. Click here to go to the answer

Author Question: Flat-slab formwork is more costly to build because of the _____. a. need for special shoring b. ... (Read 69 times)

tth

  • Hero Member
  • *****
  • Posts: 579
Flat-slab formwork is more costly to build because of the _____.
 
  a. need for special shoring
  b. amount of material required
  c. complex reinforcement that must be built
  d. drop panels required at each column

Question 2

When using weave beads in flat open-root V-groove welds, use a _____.
 
  a. 10- to 15-degree drag angle
  b. 15- to 20-degree drag angle
  c. 10- to 15-degree push angle
  d. 35- to 40-degree push angle



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

atrochim

  • Sr. Member
  • ****
  • Posts: 331
Answer to Question 1

d

Answer to Question 2

a




tth

  • Member
  • Posts: 579
Reply 2 on: Jul 24, 2018
Excellent


cici

  • Member
  • Posts: 325
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

Did you know?

The average human gut is home to perhaps 500 to 1,000 different species of bacteria.

Did you know?

Asthma is the most common chronic childhood disease in the world. Most children who develop asthma have symptoms before they are 5 years old.

Did you know?

When blood is deoxygenated and flowing back to the heart through the veins, it is dark reddish-blue in color. Blood in the arteries that is oxygenated and flowing out to the body is bright red. Whereas arterial blood comes out in spurts, venous blood flows.

Did you know?

The first oral chemotherapy drug for colon cancer was approved by FDA in 2001.

For a complete list of videos, visit our video library