This topic contains a solution. Click here to go to the answer

Author Question: When doing a quantity takeoff, the last step is to _____. a. list the materials specified for ... (Read 32 times)

Destiiny22

  • Hero Member
  • *****
  • Posts: 557
When doing a quantity takeoff, the last step is to _____.
 
  a. list the materials specified for each system
  b. total the quantities per category of material
  c. determine the scope of the work to be done
  d. review the specifications and seek clarification, if necessary
  HVAC

Question 2

Which aspects of contractual arrangements are covered in the Special and General Conditions portions of a
  specification?
 
  a. Non-technical
  b. Technical
  c. Equipment and materials
  d. Regulatory compliance



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

flannelavenger

  • Sr. Member
  • ****
  • Posts: 322
Answer to Question 1

b

Answer to Question 2

a




Destiiny22

  • Member
  • Posts: 557
Reply 2 on: Jul 24, 2018
Wow, this really help


brbarasa

  • Member
  • Posts: 308
Reply 3 on: Yesterday
YES! Correct, THANKS for helping me on my review

 

Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

Did you know?

Eat fiber! A diet high in fiber can help lower cholesterol levels by as much as 10%.

Did you know?

It is widely believed that giving a daily oral dose of aspirin to heart attack patients improves their chances of survival because the aspirin blocks the formation of new blood clots.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

The tallest man ever known was Robert Wadlow, an American, who reached the height of 8 feet 11 inches. He died at age 26 years from an infection caused by the immense weight of his body (491 pounds) and the stress on his leg bones and muscles.

For a complete list of videos, visit our video library