Which of the following is(are) a step(s) in Materials Requirements Planning (MRP)?
 
 


 
 

a. Specify needed resources and decide when they must be available.
  b. Determines existing inventory.
  c. Computer generates reports that tell the manager what and when to order.
  d. All of these are MRP steps.
  e. None of these are MRP steps.
 
 



Question 2

Which of the following is true as regards Enterprise Resource Planning (ERP)
 
 

a. It is a specialized, focused system used to monitor particular organizational
  processes.
  b. It is an extension of Materials Requirements Planning (MRP).
  c. It does not require computers.
  d. All of these are correct.
  e. None of these are correct.




ryhom

  • Sr. Member
  • ****
  • Posts: 366
Answer to Question 1

D

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Interferon was scarce and expensive until 1980, when the interferon gene was inserted into bacteria using recombinant DNA technology, allowing for mass cultivation and purification from bacterial cultures.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

Nitroglycerin is used to alleviate various heart-related conditions, and it is also the chief component of dynamite (but mixed in a solid clay base to stabilize it).

Did you know?

The strongest synthetic topical retinoid drug available, tazarotene, is used to treat sun-damaged skin, acne, and psoriasis.

Did you know?

The first documented use of surgical anesthesia in the United States was in Connecticut in 1844.

For a complete list of videos, visit our video library