This topic contains a solution. Click here to go to the answer

Author Question: For each part of the job, the concrete cover is determined by the _____. a. architect b. local ... (Read 88 times)

torybrooks

  • Hero Member
  • *****
  • Posts: 500
For each part of the job, the concrete cover is determined by the _____.
 
  a. architect
  b. local codes
  c. structural engineer
  d. concrete contractor

Question 2

A concrete slab with double curvature is a _____.
 
  a. barrel-shell roof
  b. Gothic arch
  c. simple arch
  d. dome roof



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

popopong

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

c

Answer to Question 2

d




popopong

  • Sr. Member
  • ****
  • Posts: 307

 

Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

Did you know?

Medication errors are more common among seriously ill patients than with those with minor conditions.

Did you know?

ACTH levels are normally highest in the early morning (between 6 and 8 A.M.) and lowest in the evening (between 6 and 11 P.M.). Therefore, a doctor who suspects abnormal levels looks for low ACTH in the morning and high ACTH in the evening.

Did you know?

Human kidneys will clean about 1 million gallons of blood in an average lifetime.

For a complete list of videos, visit our video library