Author Question: For each part of the job, the concrete cover is determined by the _____. a. architect b. local ... (Read 79 times)

torybrooks

  • Hero Member
  • *****
  • Posts: 500
For each part of the job, the concrete cover is determined by the _____.
 
  a. architect
  b. local codes
  c. structural engineer
  d. concrete contractor

Question 2

A concrete slab with double curvature is a _____.
 
  a. barrel-shell roof
  b. Gothic arch
  c. simple arch
  d. dome roof



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

popopong

  • Sr. Member
  • ****
  • Posts: 307
Answer to Question 1

c

Answer to Question 2

d




popopong

  • Sr. Member
  • ****
  • Posts: 307

 

Did you know?

Women are 50% to 75% more likely than men to experience an adverse drug reaction.

Did you know?

The first successful kidney transplant was performed in 1954 and occurred in Boston. A kidney from an identical twin was transplanted into his dying brother's body and was not rejected because it did not appear foreign to his body.

Did you know?

Street names for barbiturates include reds, red devils, yellow jackets, blue heavens, Christmas trees, and rainbows. They are commonly referred to as downers.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

Did you know?

A serious new warning has been established for pregnant women against taking ACE inhibitors during pregnancy. In the study, the risk of major birth defects in children whose mothers took ACE inhibitors during the first trimester was nearly three times higher than in children whose mothers didn't take ACE inhibitors. Physicians can prescribe alternative medications for pregnant women who have symptoms of high blood pressure.

For a complete list of videos, visit our video library