This topic contains a solution. Click here to go to the answer

Author Question: ________ is (are) the final component in construction of the structural floor system. A) Finish ... (Read 49 times)

serike

  • Hero Member
  • *****
  • Posts: 542
________ is (are) the final component in construction of the structural floor system.
 
  A) Finish beams B) Floor joists C) Subflooring D) Underlayment

Question 2

When changing the blade on a circular saw, the purpose of the small hole in the side of the blade of a power saw is to help ________.
 
  A) Indicate proper turn direction of the blade B) Hold the blade when the arbor nut is turned
  C) Hold the blade guard D) Line the foot (base) of the blade



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

xiaomengxian

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

C

Answer to Question 2

B





 

Did you know?

Excessive alcohol use costs the country approximately $235 billion every year.

Did you know?

Hippocrates noted that blood separates into four differently colored liquids when removed from the body and examined: a pure red liquid mixed with white liquid material with a yellow-colored froth at the top and a black substance that settles underneath; he named these the four humors (for blood, phlegm, yellow bile, and black bile).

Did you know?

Approximately 25% of all reported medication errors result from some kind of name confusion.

Did you know?

Persons who overdose with cardiac glycosides have a better chance of overall survival if they can survive the first 24 hours after the overdose.

Did you know?

Automated pill dispensing systems have alarms to alert patients when the correct dosing time has arrived. Most systems work with many varieties of medications, so patients who are taking a variety of drugs can still be in control of their dose regimen.

For a complete list of videos, visit our video library