This topic contains a solution. Click here to go to the answer

Author Question: ________ is (are) the final component in construction of the structural floor system. A) Finish ... (Read 100 times)

serike

  • Hero Member
  • *****
  • Posts: 542
________ is (are) the final component in construction of the structural floor system.
 
  A) Finish beams B) Floor joists C) Subflooring D) Underlayment

Question 2

When changing the blade on a circular saw, the purpose of the small hole in the side of the blade of a power saw is to help ________.
 
  A) Indicate proper turn direction of the blade B) Hold the blade when the arbor nut is turned
  C) Hold the blade guard D) Line the foot (base) of the blade



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

xiaomengxian

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

C

Answer to Question 2

B





 

Did you know?

Between 1999 and 2012, American adults with high total cholesterol decreased from 18.3% to 12.9%

Did you know?

Sildenafil (Viagra®) has two actions that may be of consequence in patients with heart disease. It can lower the blood pressure, and it can interact with nitrates. It should never be used in patients who are taking nitrates.

Did you know?

Eating food that has been cooked with poppy seeds may cause you to fail a drug screening test, because the seeds contain enough opiate alkaloids to register as a positive.

Did you know?

For pediatric patients, intravenous fluids are the most commonly cited products involved in medication errors that are reported to the USP.

Did you know?

Medication errors are three times higher among children and infants than with adults.

For a complete list of videos, visit our video library