Author Question: ________ is (are) the final component in construction of the structural floor system. A) Finish ... (Read 93 times)

serike

  • Hero Member
  • *****
  • Posts: 542
________ is (are) the final component in construction of the structural floor system.
 
  A) Finish beams B) Floor joists C) Subflooring D) Underlayment

Question 2

When changing the blade on a circular saw, the purpose of the small hole in the side of the blade of a power saw is to help ________.
 
  A) Indicate proper turn direction of the blade B) Hold the blade when the arbor nut is turned
  C) Hold the blade guard D) Line the foot (base) of the blade



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

xiaomengxian

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

C

Answer to Question 2

B





 

Did you know?

Elderly adults are living longer, and causes of death are shifting. At the same time, autopsy rates are at or near their lowest in history.

Did you know?

Always store hazardous household chemicals in their original containers out of reach of children. These include bleach, paint, strippers and products containing turpentine, garden chemicals, oven cleaners, fondue fuels, nail polish, and nail polish remover.

Did you know?

The first monoclonal antibodies were made exclusively from mouse cells. Some are now fully human, which means they are likely to be safer and may be more effective than older monoclonal antibodies.

Did you know?

Cyanide works by making the human body unable to use oxygen.

Did you know?

Ether was used widely for surgeries but became less popular because of its flammability and its tendency to cause vomiting. In England, it was quickly replaced by chloroform, but this agent caused many deaths and lost popularity.

For a complete list of videos, visit our video library