This topic contains a solution. Click here to go to the answer

Author Question: ________ is (are) the final component in construction of the structural floor system. A) Finish ... (Read 46 times)

serike

  • Hero Member
  • *****
  • Posts: 542
________ is (are) the final component in construction of the structural floor system.
 
  A) Finish beams B) Floor joists C) Subflooring D) Underlayment

Question 2

When changing the blade on a circular saw, the purpose of the small hole in the side of the blade of a power saw is to help ________.
 
  A) Indicate proper turn direction of the blade B) Hold the blade when the arbor nut is turned
  C) Hold the blade guard D) Line the foot (base) of the blade



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

xiaomengxian

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

C

Answer to Question 2

B





 

Did you know?

Bacteria have been found alive in a lake buried one half mile under ice in Antarctica.

Did you know?

The first successful kidney transplant was performed in 1954 and occurred in Boston. A kidney from an identical twin was transplanted into his dying brother's body and was not rejected because it did not appear foreign to his body.

Did you know?

Disorders that may affect pharmacodynamics include genetic mutations, malnutrition, thyrotoxicosis, myasthenia gravis, Parkinson's disease, and certain forms of insulin-resistant diabetes mellitus.

Did you know?

The lipid bilayer is made of phospholipids. They are arranged in a double layer because one of their ends is attracted to water while the other is repelled by water.

Did you know?

The first-known contraceptive was crocodile dung, used in Egypt in 2000 BC. Condoms were also reportedly used, made of animal bladders or intestines.

For a complete list of videos, visit our video library