Author Question: ________ is (are) the final component in construction of the structural floor system. A) Finish ... (Read 98 times)

serike

  • Hero Member
  • *****
  • Posts: 542
________ is (are) the final component in construction of the structural floor system.
 
  A) Finish beams B) Floor joists C) Subflooring D) Underlayment

Question 2

When changing the blade on a circular saw, the purpose of the small hole in the side of the blade of a power saw is to help ________.
 
  A) Indicate proper turn direction of the blade B) Hold the blade when the arbor nut is turned
  C) Hold the blade guard D) Line the foot (base) of the blade



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

xiaomengxian

  • Sr. Member
  • ****
  • Posts: 311
Answer to Question 1

C

Answer to Question 2

B





 

Did you know?

People often find it difficult to accept the idea that bacteria can be beneficial and improve health. Lactic acid bacteria are good, and when eaten, these bacteria improve health and increase longevity. These bacteria included in foods such as yogurt.

Did you know?

As the western states of America were settled, pioneers often had to drink rancid water from ponds and other sources. This often resulted in chronic diarrhea, causing many cases of dehydration and death that could have been avoided if clean water had been available.

Did you know?

Acetaminophen (Tylenol) in overdose can seriously damage the liver. It should never be taken by people who use alcohol heavily; it can result in severe liver damage and even a condition requiring a liver transplant.

Did you know?

On average, someone in the United States has a stroke about every 40 seconds. This is about 795,000 people per year.

Did you know?

The average adult has about 21 square feet of skin.

For a complete list of videos, visit our video library