Author Question: The term fast track means __________. a. Design/ build b. Construction starts before the design ... (Read 317 times)

123654777

  • Hero Member
  • *****
  • Posts: 585
The term fast track means __________.
 
  a. Design/ build
  b. Construction starts before the design is complete
  c. Cost plus fixed fee
  d. None of the above

Question 2

In a Design/Bid/Build contractual arrangement, the architect signs a contract with the _________ .
 
  a. Owner
  b. Construction manager
  c. General contractor
  d. Subcontractor
  e. None of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

nickk12214

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

B

Answer to Question 2

A




123654777

  • Member
  • Posts: 585
Reply 2 on: Jul 26, 2018
Thanks for the timely response, appreciate it


bulacsom

  • Member
  • Posts: 329
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

The horizontal fraction bar was introduced by the Arabs.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

Did you know?

There are 60,000 miles of blood vessels in every adult human.

Did you know?

Chronic necrotizing aspergillosis has a slowly progressive process that, unlike invasive aspergillosis, does not spread to other organ systems or the blood vessels. It most often affects middle-aged and elderly individuals, spreading to surrounding tissue in the lungs. The disease often does not respond to conventionally successful treatments, and requires individualized therapies in order to keep it from becoming life-threatening.

For a complete list of videos, visit our video library