The term fast track means __________.
 
  a. Design/ build
  b. Construction starts before the design is complete
  c. Cost plus fixed fee
  d. None of the above

Question 2

In a Design/Bid/Build contractual arrangement, the architect signs a contract with the _________ .
 
  a. Owner
  b. Construction manager
  c. General contractor
  d. Subcontractor
  e. None of the above



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

nickk12214

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

B

Answer to Question 2

A




123654777

  • Member
  • Posts: 585
Reply 2 on: Jul 26, 2018
Wow, this really help


abro1885

  • Member
  • Posts: 337
Reply 3 on: Yesterday
:D TYSM

 

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

Drug-induced pharmacodynamic effects manifested in older adults include drug-induced renal toxicity, which can be a major factor when these adults are experiencing other kidney problems.

Did you know?

For pediatric patients, intravenous fluids are the most commonly cited products involved in medication errors that are reported to the USP.

Did you know?

It is widely believed that giving a daily oral dose of aspirin to heart attack patients improves their chances of survival because the aspirin blocks the formation of new blood clots.

Did you know?

More than 2,500 barbiturates have been synthesized. At the height of their popularity, about 50 were marketed for human use.

For a complete list of videos, visit our video library