Author Question: Material Requirements Planning (MRP) operates on a component product level which is the level ... (Read 37 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above

Question 2

In two-way ANOVA, there are ___________________ _ factors, each of which operates on ___________________ _ or more levels.
 Fill in the blank(s) with correct word



irishcancer18

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

two; two
2, 2



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The Romans did not use numerals to indicate fractions but instead used words to indicate parts of a whole.

Did you know?

Cytomegalovirus affects nearly the same amount of newborns every year as Down syndrome.

Did you know?

Malaria mortality rates are falling. Increased malaria prevention and control measures have greatly improved these rates. Since 2000, malaria mortality rates have fallen globally by 60% among all age groups, and by 65% among children under age 5.

Did you know?

Egg cells are about the size of a grain of sand. They are formed inside of a female's ovaries before she is even born.

Did you know?

Complications of influenza include: bacterial pneumonia, ear and sinus infections, dehydration, and worsening of chronic conditions such as asthma, congestive heart failure, or diabetes.

For a complete list of videos, visit our video library