Author Question: Material Requirements Planning (MRP) operates on a component product level which is the level ... (Read 46 times)

genevieve1028

  • Hero Member
  • *****
  • Posts: 601
Material Requirements Planning (MRP) operates on a component product level which is the level _____________ also operates at. (1). Component/Supplier Capacity Planning (SCP) (2). Sub-assembly/Input/Output Analysis (3). Raw material/Supply Chain Planning (4). Component/Resource Capacity Planning
 a. (1) c. (3)
  b. (2) or (4) d. None of the above

Question 2

In two-way ANOVA, there are ___________________ _ factors, each of which operates on ___________________ _ or more levels.
 Fill in the blank(s) with correct word



irishcancer18

  • Sr. Member
  • ****
  • Posts: 310
Answer to Question 1

A

Answer to Question 2

two; two
2, 2



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

Cytomegalovirus affects nearly the same amount of newborns every year as Down syndrome.

Did you know?

Patients should never assume they are being given the appropriate drugs. They should make sure they know which drugs are being prescribed, and always double-check that the drugs received match the prescription.

Did you know?

Medication errors are three times higher among children and infants than with adults.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

For a complete list of videos, visit our video library