This topic contains a solution. Click here to go to the answer

Author Question: If the lower-control limit of a P chart is negative, a. a mistake has been made in the computations ... (Read 25 times)

washai

  • Hero Member
  • *****
  • Posts: 523
If the lower-control limit of a P chart is negative,
 a. a mistake has been made in the computations
  b. use the absolute value of the lower limit
  c. it is set to zero
  d. None of these alternatives is correct.

Question 2

A control chart that is used when the output of a production process is measured in terms of the percent defective is
 a. a P chart
  b. an X bar chart
  c. a process chart
  d. None of these alternatives is correct.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

matt

  • Sr. Member
  • ****
  • Posts: 344
Answer to Question 1

C

Answer to Question 2

A




washai

  • Member
  • Posts: 523
Reply 2 on: Jun 24, 2018
Excellent


nguyenhoanhat

  • Member
  • Posts: 332
Reply 3 on: Yesterday
Gracias!

 

Did you know?

Russia has the highest death rate from cardiovascular disease followed by the Ukraine, Romania, Hungary, and Poland.

Did you know?

There are 20 feet of blood vessels in each square inch of human skin.

Did you know?

A seasonal flu vaccine is the best way to reduce the chances you will get seasonal influenza and spread it to others.

Did you know?

The human body's pharmacokinetics are quite varied. Our hair holds onto drugs longer than our urine, blood, or saliva. For example, alcohol can be detected in the hair for up to 90 days after it was consumed. The same is true for marijuana, cocaine, ecstasy, heroin, methamphetamine, and nicotine.

Did you know?

Inotropic therapy does not have a role in the treatment of most heart failure patients. These drugs can make patients feel and function better but usually do not lengthen the predicted length of their lives.

For a complete list of videos, visit our video library