This topic contains a solution. Click here to go to the answer

Author Question: The estimation of the value for a continuous outcome is done during _____. a. classification b. ... (Read 84 times)

deesands

  • Hero Member
  • *****
  • Posts: 514
The estimation of the value for a continuous outcome is done during _____.
 a. classification
  b. prediction
  c. data preparation
  d. data sampling

Question 2

Thirty samples of size 1200 were drawn from a manufacturing process and the number of defectives in each sample was counted. The mean sample proportion was 0.04 . The upper control limit for the 3-sigma p chart is:
 a. 0.0170.
  b. 0.0570.
  c. 0.1518.
  d. 0.0230.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

onowka

  • Sr. Member
  • ****
  • Posts: 353
Answer to Question 1

B

Answer to Question 2

B





 

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

Medication errors are more common among seriously ill patients than with those with minor conditions.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

Did you know?

The first oncogene was discovered in 1970 and was termed SRC (pronounced "SARK").

Did you know?

Recent studies have shown that the number of medication errors increases in relation to the number of orders that are verified per pharmacist, per work shift.

For a complete list of videos, visit our video library