This topic contains a solution. Click here to go to the answer

Author Question: The estimation of the value for a continuous outcome is done during _____. a. classification b. ... (Read 123 times)

deesands

  • Hero Member
  • *****
  • Posts: 514
The estimation of the value for a continuous outcome is done during _____.
 a. classification
  b. prediction
  c. data preparation
  d. data sampling

Question 2

Thirty samples of size 1200 were drawn from a manufacturing process and the number of defectives in each sample was counted. The mean sample proportion was 0.04 . The upper control limit for the 3-sigma p chart is:
 a. 0.0170.
  b. 0.0570.
  c. 0.1518.
  d. 0.0230.



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

onowka

  • Sr. Member
  • ****
  • Posts: 353
Answer to Question 1

B

Answer to Question 2

B





 

Did you know?

The modern decimal position system was the invention of the Hindus (around 800 AD), involving the placing of numerals to indicate their value (units, tens, hundreds, and so on).

Did you know?

The average office desk has 400 times more bacteria on it than a toilet.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

Looking at the sun may not only cause headache and distort your vision temporarily, but it can also cause permanent eye damage. Any exposure to sunlight adds to the cumulative effects of ultraviolet (UV) radiation on your eyes. UV exposure has been linked to eye disorders such as macular degeneration, solar retinitis, and corneal dystrophies.

Did you know?

In inpatient settings, adverse drug events account for an estimated one in three of all hospital adverse events. They affect approximately 2 million hospital stays every year, and prolong hospital stays by between one and five days.

For a complete list of videos, visit our video library