Author Question: Which of the following tracks a product from design, continuing through manufacture, and culminating ... (Read 61 times)

mcmcdaniel

  • Hero Member
  • *****
  • Posts: 550
Which of the following tracks a product from design, continuing through manufacture, and culminating with the disposal of the product at the end of its life?
 a. supply chain management (SCM)
  b. value chain
  c. product life cycle management (PLM)
  d. none of the above

Question 2

A Pension Trust Fund that is provided by a government solely for the benefit of its employees is known as a
 
  A. Single-employer plan.
  B. Cost-sharing plan.
  C. Defined contribution plan.
  D. Defined benefit plan.



Bsand8

  • Sr. Member
  • ****
  • Posts: 327
Answer to Question 1

C

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

Did you know?

The ratio of hydrogen atoms to oxygen in water (H2O) is 2:1.

Did you know?

Disorders that may affect pharmacodynamics include genetic mutations, malnutrition, thyrotoxicosis, myasthenia gravis, Parkinson's disease, and certain forms of insulin-resistant diabetes mellitus.

Did you know?

In 1835 it was discovered that a disease of silkworms known as muscardine could be transferred from one silkworm to another, and was caused by a fungus.

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

For a complete list of videos, visit our video library