This topic contains a solution. Click here to go to the answer

Author Question: In the evaluation of training, a determination of whether the trainer actually covered all aspects ... (Read 47 times)

jayhills49

  • Hero Member
  • *****
  • Posts: 559
In the evaluation of training, a determination of whether the trainer actually covered all aspects of the training as designed is called
 
  A) Outcome evaluation.
  B) Outcome.
  C) Phase evaluation.
  D) Process evaluation.
  E) Procedural evaluation.

Question 2

The implementation of seniority systems is required by the federal law.
 
  Indicate whether the statement is true or false



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
Marked as best answer by a Subject Expert

Sarahjh

  • Sr. Member
  • ****
  • Posts: 370
Answer to Question 1

D

Answer to Question 2

False





 

Did you know?

Hypertension is a silent killer because it is deadly and has no significant early symptoms. The danger from hypertension is the extra load on the heart, which can lead to hypertensive heart disease and kidney damage. This occurs without any major symptoms until the high blood pressure becomes extreme. Regular blood pressure checks are an important method of catching hypertension before it can kill you.

Did you know?

The top five reasons that children stay home from school are as follows: colds, stomach flu (gastroenteritis), ear infection (otitis media), pink eye (conjunctivitis), and sore throat.

Did you know?

Symptoms of kidney problems include a loss of appetite, back pain (which may be sudden and intense), chills, abdominal pain, fluid retention, nausea, the urge to urinate, vomiting, and fever.

Did you know?

Vaccines prevent between 2.5 and 4 million deaths every year.

Did you know?

In 1864, the first barbiturate (barbituric acid) was synthesized.

For a complete list of videos, visit our video library