Author Question: If ________ is/are assigned to make changes to a system, they must first check out a copy of the ... (Read 41 times)

leilurhhh

  • Hero Member
  • *****
  • Posts: 560
If ________ is/are assigned to make changes to a system, they must first check out a copy of the baseline system modules since no one is allowed to directly modify the baseline modules.
 
  A) System Priority Board
  B) Maintenance personnel
  C) A project manager
  D) Other groups

Question 2

________ is/are the guidelines that list the instructions to construct an executable system from the baseline source code.
 
  A) Change request
  B) Build routines
  C) Baseline modules
  D) Configuration management



olivia_paige29

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

B

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Human kidneys will clean about 1 million gallons of blood in an average lifetime.

Did you know?

Asthma cases in Americans are about 75% higher today than they were in 1980.

Did you know?

About 80% of major fungal systemic infections are due to Candida albicans. Another form, Candida peritonitis, occurs most often in postoperative patients. A rare disease, Candida meningitis, may follow leukemia, kidney transplant, other immunosuppressed factors, or when suffering from Candida septicemia.

Did you know?

The first-known contraceptive was crocodile dung, used in Egypt in 2000 BC. Condoms were also reportedly used, made of animal bladders or intestines.

Did you know?

The top 10 most important tips that will help you grow old gracefully include (1) quit smoking, (2) keep your weight down, (3) take supplements, (4) skip a meal each day or fast 1 day per week, (5) get a pet, (6) get medical help for chronic pain, (7) walk regularly, (8) reduce arguments, (9) put live plants in your living space, and (10) do some weight training.

For a complete list of videos, visit our video library