Author Question: If ________ is/are assigned to make changes to a system, they must first check out a copy of the ... (Read 49 times)

leilurhhh

  • Hero Member
  • *****
  • Posts: 560
If ________ is/are assigned to make changes to a system, they must first check out a copy of the baseline system modules since no one is allowed to directly modify the baseline modules.
 
  A) System Priority Board
  B) Maintenance personnel
  C) A project manager
  D) Other groups

Question 2

________ is/are the guidelines that list the instructions to construct an executable system from the baseline source code.
 
  A) Change request
  B) Build routines
  C) Baseline modules
  D) Configuration management



olivia_paige29

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

B

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

You should not take more than 1,000 mg of vitamin E per day. Doses above this amount increase the risk of bleeding problems that can lead to a stroke.

Did you know?

Historic treatments for rheumatoid arthritis have included gold salts, acupuncture, a diet consisting of apples or rhubarb, nutmeg, nettles, bee venom, bracelets made of copper, prayer, rest, tooth extractions, fasting, honey, vitamins, insulin, snow collected on Christmas, magnets, and electric convulsion therapy.

Did you know?

The term pharmacology is derived from the Greek words pharmakon("claim, medicine, poison, or remedy") and logos ("study").

Did you know?

Hyperthyroidism leads to an increased rate of metabolism and affects about 1% of women but only 0.1% of men. For most people, this increased metabolic rate causes the thyroid gland to become enlarged (known as a goiter).

Did you know?

Parkinson's disease is both chronic and progressive. This means that it persists over a long period of time and that its symptoms grow worse over time.

For a complete list of videos, visit our video library