Author Question: If ________ is/are assigned to make changes to a system, they must first check out a copy of the ... (Read 44 times)

leilurhhh

  • Hero Member
  • *****
  • Posts: 560
If ________ is/are assigned to make changes to a system, they must first check out a copy of the baseline system modules since no one is allowed to directly modify the baseline modules.
 
  A) System Priority Board
  B) Maintenance personnel
  C) A project manager
  D) Other groups

Question 2

________ is/are the guidelines that list the instructions to construct an executable system from the baseline source code.
 
  A) Change request
  B) Build routines
  C) Baseline modules
  D) Configuration management



olivia_paige29

  • Sr. Member
  • ****
  • Posts: 334
Answer to Question 1

B

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The familiar sounds of your heart are made by the heart's valves as they open and close.

Did you know?

Every 10 seconds, a person in the United States goes to the emergency room complaining of head pain. About 1.2 million visits are for acute migraine attacks.

Did you know?

It is important to read food labels and choose foods with low cholesterol and saturated trans fat. You should limit saturated fat to no higher than 6% of daily calories.

Did you know?

Stroke kills people from all ethnic backgrounds, but the people at highest risk for fatal strokes are: black men, black women, Asian men, white men, and white women.

Did you know?

Since 1988, the CDC has reported a 99% reduction in bacterial meningitis caused by Haemophilus influenzae, due to the introduction of the vaccine against it.

For a complete list of videos, visit our video library