Author Question: What are the questions that should be considered when making decisions on the division between PIP ... (Read 90 times)

darbym82

  • Hero Member
  • *****
  • Posts: 570
What are the questions that should be considered when making decisions on the division between PIP and analysis? Explain each question.
 
  What will be an ideal response?

Question 2

When an organization has the resources and a system must be built from scratch, an organization should choose what type of software?
 
  A) In-house development
  B) Prepackaged software
  C) Off the shelf
  D) Open source


stanleka1

  • Sr. Member
  • ****
  • Posts: 325
Answer to Question 1

1. How much effort should be expended on the project initiation and planning process? How much effort should be expended on the PIP process, is often difficult. Practical experience has found, however, that proper and insightful project planning, including determining project scope as well as identifying project activities, can easily reduce time in later project phases.
2. Who is responsible for performing the project initiation and planning process? Most organizations assign an experienced systems analyst, or a team of analysts for large projects, to perform PIP. The analyst will work with the proposed customers of the system and other technical development staff in preparing the final plan.
3. Why is project initiation and planning such a challenging activity? PIP is viewed as a challenging activity because the objective of the PIP study is to transform a vague system request document into a tangible project description. This is an open-ended process. The analyst must clearly understand the motivation for and objectives of the proposed system.

Answer to Question 2

A



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

GI conditions that will keep you out of the U.S. armed services include ulcers, varices, fistulas, esophagitis, gastritis, congenital abnormalities, inflammatory bowel disease, enteritis, colitis, proctitis, duodenal diverticula, malabsorption syndromes, hepatitis, cirrhosis, cysts, abscesses, pancreatitis, polyps, certain hemorrhoids, splenomegaly, hernias, recent abdominal surgery, GI bypass or stomach stapling, and artificial GI openings.

Did you know?

For high blood pressure (hypertension), a new class of drug, called a vasopeptidase blocker (inhibitor), has been developed. It decreases blood pressure by simultaneously dilating the peripheral arteries and increasing the body's loss of salt.

Did you know?

During the twentieth century, a variant of the metric system was used in Russia and France in which the base unit of mass was the tonne. Instead of kilograms, this system used millitonnes (mt).

Did you know?

Many of the drugs used by neuroscientists are derived from toxic plants and venomous animals (such as snakes, spiders, snails, and puffer fish).

Did you know?

Urine turns bright yellow if larger than normal amounts of certain substances are consumed; one of these substances is asparagus.

For a complete list of videos, visit our video library