Author Question: Pessimistic time refers to: A) the maximum period of time for an activity to be completed. B) ... (Read 102 times)

Kikoku

  • Hero Member
  • *****
  • Posts: 540
Pessimistic time refers to:
 
  A) the maximum period of time for an activity to be completed.
  B) the minimum period of time for an activity to be completed.
  C) the planner's best guess of the amount of time the activity actually will require for completion.
  D) the maximum period of time for an entire project to be completed.
  E) the average period of time for an activity to be completed.

Question 2

Data cannot move directly from a source to a sink.
 
  Indicate whether the statement is true or false



dellikani2015

  • Sr. Member
  • ****
  • Posts: 332
Answer to Question 1

A
Explanation: A) When scheduling, if one considers that a task will take the maximum time this is pessimistic time.

Answer to Question 2

TRUE
Explanation: Data must be moved by a process.
CL



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Many medications that are used to treat infertility are injected subcutaneously. This is easy to do using the anterior abdomen as the site of injection but avoiding the area directly around the belly button.

Did you know?

If you could remove all of your skin, it would weigh up to 5 pounds.

Did you know?

In women, pharmacodynamic differences include increased sensitivity to (and increased effectiveness of) beta-blockers, opioids, selective serotonin reuptake inhibitors, and typical antipsychotics.

Did you know?

Everyone has one nostril that is larger than the other.

Did you know?

The Centers for Disease Control and Prevention (CDC) was originally known as the Communicable Disease Center, which was formed to fight malaria. It was originally headquartered in Atlanta, Georgia, since the Southern states faced the worst threat from malaria.

For a complete list of videos, visit our video library