Author Question: To make sure that it receives adequate funding and room in the project schedule, training should be ... (Read 77 times)

jace

  • Hero Member
  • *****
  • Posts: 541
To make sure that it receives adequate funding and room in the project schedule, training should be endorsed by ________ management.
 
  A) senior
  B) operational
  C) lower level
  D) casual
  E) none of the above

Question 2

One key concern about hosted CRM applications is that they do occasionally experience downtime and this can really hurt the company whose application is hosted.
 
  Indicate whether the statement is true or false



sarahccccc

  • Sr. Member
  • ****
  • Posts: 318
Answer to Question 1

A

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Sildenafil (Viagra®) has two actions that may be of consequence in patients with heart disease. It can lower the blood pressure, and it can interact with nitrates. It should never be used in patients who are taking nitrates.

Did you know?

The term pharmacology is derived from the Greek words pharmakon("claim, medicine, poison, or remedy") and logos ("study").

Did you know?

Allergies play a major part in the health of children. The most prevalent childhood allergies are milk, egg, soy, wheat, peanuts, tree nuts, and seafood.

Did you know?

Most strokes are caused when blood clots move to a blood vessel in the brain and block blood flow to that area. Thrombolytic therapy can be used to dissolve the clot quickly. If given within 3 hours of the first stroke symptoms, this therapy can help limit stroke damage and disability.

Did you know?

Computer programs are available that crosscheck a new drug's possible trade name with all other trade names currently available. These programs detect dangerous similarities between names and alert the manufacturer of the drug.

For a complete list of videos, visit our video library