Author Question: Because they may have to look outside the company for skilled ERP consultants, the project ________ ... (Read 42 times)

altibaby

  • Hero Member
  • *****
  • Posts: 562
Because they may have to look outside the company for skilled ERP consultants, the project ________ may depend on when the key staff are in place.
 
  A) training
  B) go live date
  C) start date
  D) stabilization

Question 2

In silo systems information is captured and re-entered several times and is not available in ________.
 
  A) batches
  B) real-time
  C) back-ups
  D) hardcopy



ryhom

  • Sr. Member
  • ****
  • Posts: 366
Answer to Question 1

C

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Walt Disney helped combat malaria by making an animated film in 1943 called The Winged Scourge. This short film starred the seven dwarfs and taught children that mosquitos transmit malaria, which is a very bad disease. It advocated the killing of mosquitos to stop the disease.

Did you know?

Many medications that are used to treat infertility are injected subcutaneously. This is easy to do using the anterior abdomen as the site of injection but avoiding the area directly around the belly button.

Did you know?

Acute bronchitis is an inflammation of the breathing tubes (bronchi), which causes increased mucus production and other changes. It is usually caused by bacteria or viruses, can be serious in people who have pulmonary or cardiac diseases, and can lead to pneumonia.

Did you know?

Hyperthyroidism leads to an increased rate of metabolism and affects about 1% of women but only 0.1% of men. For most people, this increased metabolic rate causes the thyroid gland to become enlarged (known as a goiter).

Did you know?

There are 60,000 miles of blood vessels in every adult human.

For a complete list of videos, visit our video library