Author Question: Because they may have to look outside the company for skilled ERP consultants, the project ________ ... (Read 54 times)

altibaby

  • Hero Member
  • *****
  • Posts: 562
Because they may have to look outside the company for skilled ERP consultants, the project ________ may depend on when the key staff are in place.
 
  A) training
  B) go live date
  C) start date
  D) stabilization

Question 2

In silo systems information is captured and re-entered several times and is not available in ________.
 
  A) batches
  B) real-time
  C) back-ups
  D) hardcopy



ryhom

  • Sr. Member
  • ****
  • Posts: 366
Answer to Question 1

C

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Approximately one in three babies in the United States is now delivered by cesarean section. The number of cesarean sections in the United States has risen 46% since 1996.

Did you know?

Hippocrates noted that blood separates into four differently colored liquids when removed from the body and examined: a pure red liquid mixed with white liquid material with a yellow-colored froth at the top and a black substance that settles underneath; he named these the four humors (for blood, phlegm, yellow bile, and black bile).

Did you know?

Today, nearly 8 out of 10 pregnant women living with HIV (about 1.1 million), receive antiretrovirals.

Did you know?

The oldest recorded age was 122. Madame Jeanne Calment was born in France in 1875 and died in 1997. She was a vegetarian and loved olive oil, port wine, and chocolate.

Did you know?

Serum cholesterol testing in adults is recommended every 1 to 5 years. People with diabetes and a family history of high cholesterol should be tested even more frequently.

For a complete list of videos, visit our video library