Author Question: Because they may have to look outside the company for skilled ERP consultants, the project ________ ... (Read 108 times)

altibaby

  • Hero Member
  • *****
  • Posts: 562
Because they may have to look outside the company for skilled ERP consultants, the project ________ may depend on when the key staff are in place.
 
  A) training
  B) go live date
  C) start date
  D) stabilization

Question 2

In silo systems information is captured and re-entered several times and is not available in ________.
 
  A) batches
  B) real-time
  C) back-ups
  D) hardcopy



ryhom

  • Sr. Member
  • ****
  • Posts: 366
Answer to Question 1

C

Answer to Question 2

B



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

The first successful kidney transplant was performed in 1954 and occurred in Boston. A kidney from an identical twin was transplanted into his dying brother's body and was not rejected because it did not appear foreign to his body.

Did you know?

Urine turns bright yellow if larger than normal amounts of certain substances are consumed; one of these substances is asparagus.

Did you know?

Sildenafil (Viagra®) has two actions that may be of consequence in patients with heart disease. It can lower the blood pressure, and it can interact with nitrates. It should never be used in patients who are taking nitrates.

Did you know?

Coca-Cola originally used coca leaves and caffeine from the African kola nut. It was advertised as a therapeutic agent and "pickerupper." Eventually, its formulation was changed, and the coca leaves were removed because of the effects of regulation on cocaine-related products.

Did you know?

Nearly 31 million adults in America have a total cholesterol level that is more than 240 mg per dL.

For a complete list of videos, visit our video library