Author Question: In the ________ phase of the traditional SDLC, the functional requirements have to be converted to ... (Read 113 times)

luvbio

  • Hero Member
  • *****
  • Posts: 623
In the ________ phase of the traditional SDLC, the functional requirements have to be converted to system and process flow charts, user input screens, sample reports, etc.
 
  A) maintenance
  B) design
  C) implementation
  D) analysis
  E) investigation

Question 2

An associative entity joins two entities.
 
  Indicate whether the statement is true or false



vickyvicksss

  • Sr. Member
  • ****
  • Posts: 351
Answer to Question 1

B

Answer to Question 2

TRUE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Pink eye is a term that refers to conjunctivitis, which is inflammation of the thin, clear membrane (conjunctiva) over the white part of the eye (sclera). It may be triggered by a virus, bacteria, or foreign body in the eye. Antibiotic eye drops alleviate bacterial conjunctivitis, and antihistamine allergy pills or eye drops help control allergic conjunctivitis symptoms.

Did you know?

To prove that stomach ulcers were caused by bacteria and not by stress, a researcher consumed an entire laboratory beaker full of bacterial culture. After this, he did indeed develop stomach ulcers, and won the Nobel Prize for his discovery.

Did you know?

The human body produces and destroys 15 million blood cells every second.

Did you know?

The B-complex vitamins and vitamin C are not stored in the body and must be replaced each day.

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

For a complete list of videos, visit our video library